Sign in Subscribe

Board of Health approves ADU septic system design

Board of Health · Meeting of April 28, 2026

BOLTON — Board approves ADU septic system design at Golden Run Road. Chair Chris Rogers led the Board of Health, with members Christopher Slade and Wendy Karlon, in unanimously approving a new 2,000-gallon two-compartment septic system for 58 Golden Run Road. The design replaces the existing four-bedroom infrastructure with a fully compliant five-bedroom system, featuring four 62-foot pipe-and-stone trenches installed where the current system sits.

The Board also conducted reviews of several property inspections and water reports, with most items receiving conditional approvals or deferred to the May 12 meeting.

In the full story:

  • The complete report — 296 words

Source: the Board of Health meeting of April 28, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Bolton News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Bolton News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe